ISO
Main Activities
1. Performing all the contracting and engineering works mainly in an EPC projects, such as the design and construct Army Camp, Airports , construction of all types of Buildings, Housing complexes, Service Buildings, Water Treatment plants, Waste Water Treatment Plants and Power and Electricity Plant.
2. Supply, install and maintenance of all kinds of materials and equipments for the electrical power generation stations, all the wiring works (low tension and high tension) with all accessories.
3. Supply, install and maintenance of drinkable water treatment and pumping plants and units from all sizes with any required potable piping networks.
4. Supply, install and maintenance of all the AC works units (small, medium, large).
5. Supply, install and maintenance of all types of towers for electrical power transformation and for telecommunication purposes
Company Departments
1- Planning and observation department:
This depart1- Planning and observation department:
This department is responsible on all planning operations with detailed progressing steps toward high accuracy and speed performance and execution for the required projects according to the desired scope of works.
2-Thechnical Department:
This department is the in charge of putting all the actual work steps since a high specialized and professional staff is belong to this department,
1- Planning and observation department:
This department is responsible on all planning operations with detailed progressing steps toward high accuracy and speed performance and execution for the required projects according to the desired scope of works.
2-Thechnical Department:
This department is the in charge of putting all the actual work steps since a high specialized and professional staff is belong to this department, its job is to design, support and apply all the technical works required for the desired project, also for avoiding any difficulties appears in the execution phase.
3-Managenet Department:
This department is the in charge of managing all the projects using the up to- date techniques and a tool, this department owns a specialized staff also in the projects management and communications with others relating to the projects.
ment is responsible on all planning operations with detailed progressing steps toward high accuracy and speed performance and execution for the required projects according to the desired scope of works.
2-Thechnical Department:
This department is the in charge of putting all the actual work steps since a high specialized and professional staff is belong to this department,
1- Planning and observation department:
This department is responsible on all planning operations with detailed progressing steps toward high accuracy and speed performance and execution for the required projects according to the desired scope of works.
2-Thechnical Department:
This department is the in charge of putting all the actual work steps since a high specialized and professional staff is belong to this department, its job is to design, support and apply all the technical works required for the desired project, also for avoiding any difficulties appears in the execution phase.
3-Managenet Department:
This department is the in charge of managing all the projects using the up to- date techniques and a tool, this department owns a specialized staff also in the projects management and communications with others relating to the projects.
our equipments
equipment’s
The company has many of the heavy machines equipment’s for different purposes like soil works, transportation, concrete transferring
and pumping in addition, the company owns specialized heavy machines equipment’s for electrical and mechanical purposes with all required tools for completing the desired works, below is a table shows some of the company owned heavy machines and equipment’s
Type of the machine | Qty. |
Excavator | 4 |
Concrete Mixer and
transporter |
6 |
Shuffle | 3 |
40 Ton weights loader | 4 |
Lorry | 4 |
Potable water container truck |
3 |
Concrete pumper | 1 |
Electrical power
generators high power (150 KVA) |
2 |
Crain Tadano 25 Ton | 1 |
Loader cars | 3 |
Concrete Factory
(speed 50m h ) |
1 |
Hello world!
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!